Hubbell Electric Heater Company T User Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
16
SECTION V - SERVICING & REPLACEMENT OF PARTS
WARNING / CAUTION
Before servicing or replacing any part make sure to turn the power supply switch to the OFF position.
RELIEF VALVE
1. Disconnect power from unit.
2. Shut off incoming water and boiler water supply.
3. Lift test lever on relief valve to relieve pressure in tank.
4. Disconnect overflow piping.
5. Unscrew relief valve, remove assembly and replace with new one.
6. Connect overflow piping.
7. Turn on incoming water supply and check for leaks.
8. Turn safety switch to ON position.
Test Lever
Overflow Piping Outlet
Tank Connection
Temperature Probe
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 25 26

Comments to this Manuals

No comments