Hubbell Electric Heater Company E User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 23
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
9
Outlet to floor drain Install into provided tapping
Manual Release
Lever
Temperature Probe
Temperature and Pressure Relief Valve
4. Install a relief valve overflow pipe to a nearby floor drain. CAUTION: No valve of any type
should be installed between the relief valve and tank or in the drain line.
FILLING THE HEATER
1. Completely close the drain valve.
2. Open the highest hot water faucet to allow all air to escape from piping.
3. Open the valve to the cold water inlet and allow the heater and piping system to completely
fill, as indicated by a steady flow of water from the open faucet.
ELECTRICAL INSTALLATION
1. Enter junction box with properly sized feeder leads.
2. Connect these power leads to wires enclosed in junction box with wire nuts.
3. All other electrical connections are made at the factory; therefore, no other electrical
connections are necessary.
FINAL CHECKS
1. Check all connections for tightness.
2. Ensure that all the above steps are completed
3. After the water is heated for the first time, monitor the water temperature as described in
Section III, Quarterly Inspection.
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 22 23

Comments to this Manuals

No comments