Hubbell Electric Heater Company V10 User Manual

Browse online or download User Manual for Water heaters & boilers Hubbell Electric Heater Company V10. Hubbell Electric Heater Company V10 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
OPERATING AND MAINTENANCE MANUAL FOR
ELECTRIC INDUSTRIAL PROCESS
WATER HEATER
ELECTRIC HEATER COMPANY
BASE MODEL “ V10 and V20
Page view 0
1 2 3 4 5 6 ... 26 27

Summary of Contents

Page 1 - WATER HEATER

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC INDUSTRIAL PROCESS WATER HEATER ELECTRIC HEATER COMPANY BA

Page 2

10 SECTION II – INSTALLATION WARNING / CAUTION DO NOT TURN ON THE ELECTRIC POWER SUPPLY to this equipment until heater is completely filled with w

Page 3

11 4. Install the combination temperature and pressure safety relief valve in the tapping provided. Note that this is required by law for safety

Page 4

12 FINAL CHECKS 1. Check all connections for tightness. 2. Ensure that all the above steps are completed 3. After the water is heated for the

Page 5 - CONSTRUCTION

13 1 – Terminal Block 2 – Magnetic Contactor 3 – Heating Element 4 – Low Water Cut-Off, if supplied 5 – Transformer, 480-Volt/240-Volt, installed

Page 6

14 1 – Terminal Block 2 – Magnetic Contactor 3 – Heating Element 4 – Low Water Cut-Off, if supplied 5 – Transforme

Page 8

16 SECTION III - SCHEDULED MAINTENANCE AND OPERATION WARNING / CAUTION Before performing any maintenance procedure, make certain power supply is O

Page 9

17ANNUAL INSPECTION 1. Flush tank as follows a. Shut off power supply. b. Close valve on hot water outlet piping. c. Open valve on drain pipi

Page 10 - WARNING / CAUTION

18 SECTION IV – TROUBLESHOOTING Symptom Probable Cause Corrective Action / Remedy Circuit breaker tripped at source. Reset circuit breaker. Blow

Page 11

19Faulty thermostat. Check thermostat adjustment. Monitor thermostat as described in Section III, Quarterly Inspection. Replace if necessary. Heat

Page 12

2 HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203) 378-2659 FAX: (203) 378-3593 INTERNET: http://www.hubbe

Page 13

20 SECTION V - SERVICING & REPLACEMENT OF PARTS WARNING / CAUTION Before servicing or replacing any part make sure to turn the power supply

Page 14

21IMMERSION TEMPERATURE HIGH LIMIT CUT-OFF 1. Disconnect power from unit. 2. Remove access cover. 3. Remove high limit cover screw and cover.

Page 15

22 HEATING ELEMENT 1. Disconnect power from unit. 2. Shut off incoming water supply. 3. Attach hose to drain connection. 4. Lift manual release

Page 16

23 IMMERSION THERMOSTAT 1. Disconnect power from unit. 2. Remove access cover and locate thermostat. 3. Remove high limit cover screw and cover.

Page 17

24 MAGNETIC CONTACTOR 1. Disconnect power from unit. 2. Disconnect line and load wires to contactor. 3. Disconnect two (2) 14 gauge control circu

Page 18 - SECTION IV – TROUBLESHOOTING

25RELIEF VALVE 1. Disconnect power from unit. 2. Shut off incoming water supply. 3. Lift test lever on relief valve to relieve pressure in tank.

Page 19

26 SECTION VI – MISCELLANEOUS CHARTS AND FORMULAS ELEMENT CHART Power (kW) Resistance (Ohms) Element Part # 208V 240V 480V Immersion Length Ha

Page 20

27TORQUE VALUES BOLT SIZE 18-8 S/S IN.-LBS. BRASS IN.-LBS. SILICONBRONZE IN.-LBS. ALUMINUM2024-T4 IN.-LBS. 316 S/S IN.-LBS. MONEL IN.-LBS. 4-40 5.

Page 21

3 TABLE OF CONTENTS SECTION TITLE PAGE #

Page 23

5SECTION I - GENERAL DESCRIPTION AND CONSTRUCTION GENERAL DESCRIPTION This booklet describes an electric water heater designed for use in an indus

Page 24

6 CONTROL THERMOSTAT The water heater is supplied with a single stage immersion thermostatic switch that is installed and wired at the factory. The

Page 25

7 OUTER SHELL, INSULATION, AND SUPPORTS The tank is encapsulated in 2-inches of high-density fiberglass insulation. The protective shell is constru

Page 26

8 Dial Temperature and Pressure Gauge A combination temperature (70° - 250° F) and pressure (0 – 200 psi) gauge with 2½-inch dial may be supplied fo

Page 27

9Building Management System (BMS) A Building Management System control package may be supplied for remote operation and alarm capabilities. Pump I

Comments to this Manuals

No comments